neepco: Meghalaya govt inks settlement with NEEPCO for two hydropower initiatives

[ad_1]

The Meghalaya authorities has signed an settlement with North Japanese Electrical Energy Company Ltd for growth of two hydel initiatives within the state, an official assertion stated. The settlement for the event of 50-megawatt Wah Umiam Hydro Electrical Venture Stage-I and 100-MW Wah Umiam Hydro Electrical Venture Stage-II was signed between the 2 events. Deputy Chief Minister Prestone Tynsong, state energy division Joint Secretary D D Shira and NEEPCO Director (Personnel) Anil Kumar had been current on the programme.

Tynsong expressed his gratitude to NEEPCO and stated that the signing of settlement between the 2 events is an “essential and significant occasion”.

The minister additionally assured that the state authorities will prolong all help to the executing company for completion of the mission on the earliest.

Tynsong, who’s in control of the state energy division, stated that technology is the principle drawback confronted by Meghalaya.

The state at present has a capability to supply solely 350 MW of energy, whereas the requirement is 650 MW, he stated, including that such settlement with the CPSU is important.

In accordance with the deputy chief minister, Meghalaya produces lower than 250 MW of energy despite the fact that it has the potential to generate 3,000 MW.

He urged the ability division and NEEPCO to work collectively in making Meghalaya a surplus energy producer.

Tynsong additionally asserted that the federal government together with NEEPCO is leaving no stone unturned in enhancing the ability technology capability within the state.

chopraajaycpa@gmail.com
We will be happy to hear your thoughts

Leave a reply

DGFT Consultancy
Logo
Enable registration in settings - general
Compare items
  • Total (0)
Compare
0